Temporary planning record. It lists what was checked while producing this package, how, and the limits. No runtime tests were run, because the package is documentation-only and the planning work was read-only. Sections 1–7 record the first round (early morning of 3 October 2026); section 8 records the second review round and the writes Chris later authorised.

1. Session and authority

  • Model and effort: Claude Code on Opus 5.5 (claude-opus-5-5) at maximum effort, as Chris requested; no other model was used for the main session.
  • Interruptions: the session was interrupted once to enable Remote Control and resumed in the same conversation; it was later continued from a context summary. Both times the authorised task (claude-planning-launch-2026-10-03/prompt.txt) remained the governing instruction.
  • Authority: planning only. Chris's 3 October notification scope addition was incorporated as an additive, read-only planning update. No notification was sent and no notification PR was touched.

2. Workspace safety checks (read-only)

Check Command / method Result
PR3617 worktree state at start git status --short --branch Branch feat/research-screening-as-specialised-annotation-gxgahs, 0 ahead / 0 behind upstream, HEAD 0f4c764b2; pre-existing dirty research: 2 modified + 16 untracked planning documents, none edited
Other writer in the worktree Scan of /proc/*/cwd; newest planning-document mtime Only this session's shell had its cwd there; the last prior write was 03:13, the check ran at 03:22. No clash.
Effective wt configuration main/.worktreerc + main/.worktreerc.local worktreeParent=/home/chris/workspace/syrf/pr, pattern pr{number}.{slug}, branch prefix codex; no worktree was created, moved or deleted
Handoff package vs worktree copies cmp and diff Identical except link-path rewrites in six documents and in COMPARISON ↔ syrf-v10-design-comparison.md
Main baseline git rev-parse HEAD, origin/main; git ls-remote origin refs/heads/main First 78c6d097d. Later the main checkout was found at 2949ca3a7 and then c59d9d0f1, each equal to the remote and clean; it was advanced outside this session. This session never fetched, pulled or modified it.
Code changes since the baseline git log and git diff --stat from 78c6d097d to 2949ca3a7 and c59d9d0f1, over src/libs, the API, the web app and env-mapping.yaml Only FEAT-024 work (fold slice 6, including a reservation claim-stage refactor that keeps claims keyed by stage and investigator, and #3955's question-answer staleness fix), an identity registration fix, auth-migration documents and the generated API client
Writes made git status and file modification times at the end Still the same 2 modified + 16 untracked pre-existing documents (last modified 03:00–03:08 BST, before this session's first write), plus only the new folder docs/planning/integrated-review-plan-2026-10/; no existing file changed

3. Live GitHub reads (read-only gh)

  • About 03:30–03:50 BST: gh pr list --state open --limit 250 (131 open PRs), merged PRs since 15 September (--limit 300), and gh pr view for 47 in-scope PRs and the 8 notification PRs.
  • About 04:52 BST (03:52 UTC), after the reviews: gh pr view for 41 in-scope PRs (state, draft, mergeability, author, head, base, updated time), repeated once so GitHub recomputed mergeability against the new main.
  • About 05:48 BST (04:48 UTC), after verification: gh pr view for 21 in-scope PRs and a list of PRs opened since 03:50 UTC (#3958 and #3959, both outside this plan's areas); #3955 had merged.
  • In round 1, no PR, issue, label, comment or review was created or changed. The writes made later at Chris's request are listed in section 8.

4. Sub-agents (all instructed to be strictly read-only)

Agent Purpose Type / model
Theme A inventory Question, annotation, forms, outcomes, classification, setup documents and code Explore / Opus
Theme B inventory Review workflow, operations, governance documents and code Explore / Opus
Prototype asset locator Older QM v2, newer question-interface and reviewer prototypes; found / not found Explore / Opus
Backend verification Domain and API implementation state on main Explore / Opus
Frontend verification Angular implementation state on main Explore / Opus
Notification stack inspection #3932–#3947, main email/SignalR baseline, provenance transcript excerpts Explore / Opus
Adversarial reviewers A, B, C Independent critique of the draft package (reports) Plan / Opus
Resolution verifier Fresh-context check that the resolutions landed and the restructure is consistent Plan / Opus

5. Direct re-verification of load-bearing claims

Before the reviews:

  • ChangeOwner unenforced: ResourceSecurity.json, ProjectController.cs:365-390, Project.cs:855-883, ProjectUpdateDto.cs:17.
  • Optional never read on the server: AnnotationQuestion.cs:55, 227.
  • The reconciliation response maps all study sessions: ReviewController.cs:1586-1628, StudyDto.cs:53-58.
  • Question deletion cascade and #3088 gap: ProjectManagementService.cs:201-222.
  • The redesign-prototype folder contents on main.

After the reviews, before adopting their claims (all held):

  • Strict class maps: StudyRepository.cs:3176, 3209, 3220 register ScreeningInfo, ExtractionInfo and SessionTally with no SetIgnoreExtraElements anywhere in the file; only Entity.cs:21 carries [BsonExtraElements].
  • Deletion fails closed: SearchController.cs:122, 134 and ProjectController.cs:410 throw DeletionLifecycleUnavailableException; StudyRepository.cs:1129-1130 says search deletion is disabled today; the deletionLifecycle flag entry in env-mapping.yaml.
  • "Reconciliation reserves nothing" (StageReviewService.cs:153) and "Migrate legacy reservations before enabling review eligibility" (Study.cs:346).
  • SystemQuestionVersion changes system-question structure (AnnotationQuestion.cs:561-578).
  • GreaterIsWorse is a bool (OutcomeData.cs:39); client defaults SD, mean, false (annotation-form-outcome-topology.ts:40-43).
  • The AF2 reconcile host is read-only and stage-review/preview hard-fail on reconciliation (src/services/web/CLAUDE.md AF2 section, lines 353–356).
  • AF2 eligibility must read the generated selector (annotation-form-v2-eligibility.ts:59).
  • Dockview layouts: per-reviewer capability slots and API validation (docs/architecture/dockview-layout-migration.md).
  • Impersonation edit mode admits side-effecting actions (SupportImpersonationAttributes.cs).
  • The studyAttention flag admits conversations, study reports and authorised decisions (#3947's env-mapping.yaml); #3945 and #3947 are stacked on #3944 (gh pr view base branches).
  • The authorization plan's G-D, WP9, WP11, WP-M1/M2 and D10 (handover/2026-09-08-authorization-3335/PLAN.md).
  • All seven #2621 prototypes exist; the local classification site build exists; v10's default navigation mode is "steps" with the numbered Setup section (prototype navigation code).
  • The PRISMA amendment and fixture definitions, the FEAT-011 release checklists, the outcome-measure clarification and the ledger's OC2/ODIR1 and QY4 wording were read in source.

6. Documentation validation

./docs/scripts/validate-docs.sh --verbose --skip-indexes, run in the PR3617 worktree. --skip-indexes is required because the index check runs generate-indexes.sh, which rewrites existing index.md files; this package must not modify existing files. The validator checks front matter and that linked files exist; it doesn't check #anchors, so a separate read-only anchor check was added.

Run When Result for this package Whole-repository result
1 Before every file existed Files then present passed front-matter checks; 8 broken-link errors, all pointing at package files not yet written 8 errors, 63 pre-existing warnings
2 Before the review files existed 5 broken-link errors, all pointing at reviews/ files not yet written 5 errors, 63 pre-existing warnings
3 After the resolutions All 14 package files pass front-matter checks; no broken links Exit 0; 0 errors; 63 pre-existing warnings, none from this package
4 After the verifier's fixes, 06:00 BST All 14 package files pass front-matter checks; no broken links Exit 0; 0 errors; 63 pre-existing warnings, none from this package
5 After Chris's 3 October decisions (new acceptance-criteria and PRISMA-amendment documents), about 07:30 BST All 16 package files pass front-matter checks; no broken links Exit 0; 0 errors; 63 pre-existing warnings, none from this package
6 After adding the domain-model document, about 08:50 BST All 17 package files pass front-matter checks; no broken links; 59 anchored links resolve under both slug rules Exit 0; 0 errors; 63 pre-existing warnings, none from this package

Anchor check (scratchpad script, both GitHub and MkDocs slug rules): after run 3, 42 anchored links all resolved, one only under GitHub's rule, so it was rewritten without the anchor. After run 4, 42 anchored links resolved under both rules. After run 5, 58 anchored links resolve under both rules (the amendment headings were changed from em dashes to "X." so their anchors match in both renderers).

Consistency sweep after the verifier's fixes: no stale release, gate or ID names remain outside the matrix rows that describe them; every question ID referenced in the package is defined in the open-questions document.

Not checked: the Mermaid dependency graph wasn't rendered by a Mermaid tool; its syntax follows the earlier version of the same graph.

The same results are summarised in the resolution matrix.

7. Limits

  • No runtime, browser, database or deployment checks were made. Flag states in environments come from cluster-gitops values.yaml; runtime overrides were not read.
  • The notification provenance transcript was read in targeted excerpts only; claims were checked against code.
  • The Figma file, the remote classification site and Review Prototype v3/v5 were not available; the local classification build was found but not reviewed. Three #2621 prototypes (PRISMA workflows, study state, dashboard) were inventoried by review C and by heading, not read in full.
  • Some reviewer claims were adopted with their evidence but not traced end to end (marked "per review B/C" in the inventory).
  • PR states are snapshots from 3 October 2026, about 03:30–03:50 and 04:52 BST.

8. Round 2 (afternoon and evening of 3 October 2026)

Times are BST. Chris asked for the round-2 review at about 14:30 and added the in-flight programmes at about 14:55; at about 19:00 he asked for plan progress to be committed and pushed on the PR #3617 branch.

8.1 Sub-agents

All reviewers and verifiers were instructed to be strictly read-only; drafters wrote only to the session scratchpad, and patch appliers edited only this package.

Agent Purpose Type / model
Verifier V2 The three documents added after round 1 (report) Plan / Opus
Reviewers VA, DD, UX, SR, AP, MS Versioning concept, domain design, whole-application UI and UX, methodology, allocation and pools, materialised statistics Plan / Fable
Reviewers VB, DC, AC, PH, DS, RT, NS Versioning implementation, data consistency, acceptance criteria, past-year planning, delivery, active reviewer tracking, notifications Plan / Opus
Drafters (4) Versioning model, UX strategy, methodology coverage, domain-model revision general-purpose / Fable
Drafters (4) Consistency model, delivery operating model, programme integration, acceptance-criteria revision general-purpose / Opus
Patch appliers (5) Merged the drafters' patch files into the existing documents; this session reviewed each diff sdd-worker / Sonnet (1), Opus (4)
Verifier V3 Fresh-context whole-package check after integration (report; fixes in matrix §7) general-purpose / Opus
V3 fix workers (6) Applied verifier V3's fixes from one shared brief, each owning a separate set of files; this session read every report, spot-checked the diffs and re-ran the scans sdd-worker / Opus (4), Sonnet (2)

The thirteen reviews and V2 were saved verbatim in reviews/round-2/. The fix PRs (#3964, #3965) had their own implementers and fresh-context diff verifiers under Chris's separate authorisation; they are not part of this package.

8.2 Live reads (read-only)

  • GitOps. The cluster-gitops repository, read at the remote head, has materializedProjectStatisticsFold: true for staging's API and project management services (Chris's 1 October pilot decision). This corrected review MS, which had read a stale checkout.
  • Production and staging databases. A read-only count found no project storing a grant of ChangeOwner, AssignPermissions or Delete. A read-only count of legacy reconciled sessions in production timed out on an unindexed field and was not retried; it is recorded as an off-peak task before F4.
  • GitHub. gh pr view and gh pr list for the in-flight programme PRs; the refresh time is in programme integration §1.

8.3 Writes made (all authorised)

  • Commits and pushes on the PR #3617 branch only, from about 19:00 (Chris's request), including one merge of origin/main whose only conflict, docs/planning/index.md, was regenerated with docs/scripts/generate-indexes.sh. The PR #3617 description gained a section on this package. mkdocs.yml was regenerated with docs/scripts/generate-mkdocs-nav.py because PR CI's navigation check failed on the new planning documents; the generator only added their entries.
  • Follow-up issues #3997, #3998, #3999 and #4000, filed from this session.
  • #3964: Chris authorised the fix and its shipping on a passing review and green checks, and chose it over #3969 (D1-01). It merged at 20:27 BST (merge commit 85e6facf7) after an approving review on its head and green checks; its description gained links to the follow-up issues, its worktree and branches were removed, and #3969 received a comment pointing to #3964.
  • #3617, step 0 (D1-05, approved by Chris on 3 October): the title and description were refreshed and /claude-review was requested on head 1c8b1e84c. The review gave a "comment only" verdict with nothing blocking; it said it had not read the full prose. Its two non-blocking suggestions were answered on the PR: the navigation is left to the generator, and the lifetime trigger is added in the follow-up. After the review settled and the checks were green (docs validation passed on that head), it merged at 22:42 BST (merge commit f5318074d). Its worktree and branches were then removed.
  • #4002, opened with wt new: records step 0 as merged and adds the package's lifetime (PROPOSAL) to the README.
  • No notification was sent, and no runtime code, migration, deployment or flag change was made by the planning work.

8.4 Documentation validation

./docs/scripts/validate-docs.sh --skip-indexes --skip-links, plus the anchor script. The link check was skipped in these runs because it is slow across the whole repository; the anchor script checks every relative link with an anchor in this package, and the validator run in PR CI checks links.

Run When Result for this package Whole-repository result
7 After integrating the round-2 documents, about 20:00 All package files pass front-matter checks; 205 anchored links resolve Exit 0; 0 errors; 64 warnings, none from this package (the 64th came from main in the merge)
8 After the acceptance-criteria cross-file patches and fixture-name fixes, about 20:20 As run 7; every AC, FX and contract test ID cited in the package is defined, apart from labelled round-1 review IDs Exit 0; 0 errors; 64 warnings, none from this package
9 After verifier V3's 33 fixes, about 21:10 All package files, including the saved V3 report and resolution brief, pass front-matter checks; 236 anchored links resolve under both slug rules (one renderer-specific anchor removed) Exit 0; 0 errors; 64 warnings, none from this package
10 After recording Chris's Batch D1 answers, about 22:34 All package files pass front-matter checks; 260 anchored links resolve under both slug rules; no pending-D1-… status remains Exit 0; 0 errors; 64 warnings, none from this package

8.5 Limits of round 2

  • No runtime, browser, database-write or deployment checks were made.
  • Reviewers' code citations were adopted where the resolving writer re-read them; the matrix marks where a claim was corrected instead.
  • Live PR and programme states are snapshots from 3 October 2026 and must be rechecked before any implementation decision.

9. Owner-session integration (5 October 2026)

Chris's owner session of 4–5 October 2026 handed its bundle to this planning session, followed by an addendum asking for a design-prototype handoff. Times are BST. Feature implementation remains on hold; this round changed planning documents and the status page only.

9.1 Inputs and their integrity

  • Bundle: /home/chris/workspace/syrf/handover/owner-session-2026-10-05/. The coordinator's verify_bundle.py confirmed its six manifest files; this session archived all 13 files byte for byte in owner-session-2026-10-05/ and re-checked every SHA-256 after staging (Git stores the Windows-line-ending file unchanged because the archive folder turns normalisation off).
  • original-repository-register-input.md is identical to main's open-questions file at 5245941e9 apart from its Windows line endings (checked with tr -d '\r' | diff).
  • The original prototype was resolved from the owner ledger and the v10 pack's README: the Claude Design pack SyRF Prototype v10. The three .dc.html SHA-256 values were computed from the read-only pack and recorded in the design handoff.

9.2 Sub-agents

All drafters wrote only the files assigned to them; reviewers and verifiers were read-only. Every report was read by this session, which reconciled conflicts, applied mechanical fixes and committed.

Agent Purpose Type / model
Specification drafters (5) The nine specifications (RD, DM, SP, RS, BC, TI, RI, UX, ACD) sdd-worker / Opus
Harmoniser One editor across the nine specifications: 7 known and 21 further conflicts sdd-worker / Opus
Phase 2 drafters (10) Rollout plan and tracker; guide and overview; design handoff; register, open questions and ledger; plan, README and dossier; domain, contracts and versioning; consistency, migration and PRISMA; acceptance criteria; UX, methodology and programme documents; delivery operating model sdd-worker / Opus
Integration drafter The owner-session integration hub and coverage matrix sdd-worker / Opus
Verifier V4, with four forks for checks 4 to 7 Fresh-context, read-only check of the whole integration (§9.6) general-purpose / Opus
Handoff fixer V4's design-handoff findings, in that one file sdd-worker / Sonnet

9.3 Live reads (read-only)

  • gh reads of PR and issue states for the G0 dossier, the programme documents and #3510 (the statistics gate result of 3 October and Chris's soak-gate revision of 4 October).
  • Read-only source inspection: the web manifest and index.html (PWA findings), the account deletion path (removePersonalData is unread), and docs/decisions/. ADR-014 is taken; ADR-021 was free at the first check, and #3961 took it for #3986's messaging ADR when it merged at 01:54, so ADR-022 is the next free number (git ls-tree origin/main docs/decisions/, 03:20).
  • origin/main moved during the round (#4047, #4049, #4050, #3961). Only mkdocs.yml changed on both sides; a trial three-way merge of it was clean.
  • The status page's database after republishing: the two recorded answers (Q-03, D4-18) and the G0 inputs document are unchanged (ArtifactData list, 03:29).
  • No database, cluster or production reads; no runtime builds.

9.4 Writes made (all within the request)

  • Commits and pushes on PR #4045 only, in the worktree pr/pr4045.planning-owner-session-oct-4-5 created with wt new. main was not changed.
  • The status page artifact was republished in place (version 3, 1791167435-1e02), keeping every recorded answer and G0 input. It now shows the hold, the owner-session statuses beside the original 91 items, 17 brief confirm items with recommendations, the 104-row tracker and the design-session prompt. A local browser load showed no console errors apart from the local server's missing favicon.
  • No design session was messaged, no prototype was built, no PR was closed and nothing was enabled.

9.5 Documentation validation

Check Result
./docs/scripts/validate-docs.sh --skip-indexes --skip-links Exit 0; 0 errors; 64 warnings, none from this package (all 57 package lines are passes)
Relative links and anchors across all 58 package files, including the specifications, the archive README and the owner ledger (GitHub and MkDocs slug rules) 2,498 links checked, 0 broken, after V4's fixes
generate-mkdocs-nav.py and generate-indexes.sh Navigation regenerated for the new documents; indexes unchanged
Count reconciliation recomputed from the open-questions statuses 63 + 25 + 1 = 89 (V4 recomputed the same figures independently)
Coverage matrix 119 rows (89 decisions and 30 amendments), each with a specification section and a tracker row
Acceptance-evidence placement All 288 specification evidence items placed (§9.8 of the acceptance criteria)
Archive checksums 13 of 13 match the archived copies, the bundle originals and the committed blobs
Fresh-context verifier V4 24 findings (2 Blocker, 4 Major, 18 Minor); all fixed (§9.6)

9.6 Fresh-context verification (V4)

V4 found the decisions, counts, tracker and archive correct and raised 24 findings. All were fixed in this round and checked by this session by reading the changed lines; V4 was not re-run.

  • Blockers. AC-R3d-02 and AC-R4p-03 still required DP7 cross-stage routes, which Q-15 replaced. Both are retired for AC-R3d-02r and AC-R4p-03r (stage study filters, steps and dependent clauses), with §4.37 entries, traceability rows and counts updated (58 retired IDs, 51 r rows).
  • Major.
  • The rollout plan exempted S0's seeds and browser projects from brief approval; it now matches the dossier.
  • The status page was not yet updated; it now is (§9.4).
  • No specification owned the distinct-excluded-Study count (Q-22, OS-A17). RI now has RI-R05a, RI §3.3 and RI-AE40, and AC-R5b-11 and both matrix rows were extended.
  • The remaining-inputs list omitted the TI owner-visible items and G0-D4 to G0-D10. Both are added, together with the guide's suspend option and legal-review routing.
  • Minor.
  • D2-09 timing: wanted before F4, with both options carried otherwise. (Superseded on 5 October 2026, evening: D2-09 is decided; §11.)
  • Vocabulary: Q-23's carry-forward label and the engineering-contract status for D2-03, D2-04 and D2-06.
  • The ACD legend in eight documents.
  • Retired names: AdjudicationTask in AC-R4p-01; Imported as an outcome value.
  • D2-12, merge and unmerge wording.
  • Release placements: browsing in R3c; the TR1 and RW1 dependencies; Training as a planned lane rather than an MVP item in the guide.
  • "Model decision" reintroduced.
  • Prototype timing.
  • Handoff wording:
    • the narrowed "legacy" ban;
    • reversible-deletion copy with no restore deadline, because ACD §3.3 keeps deleted projects indefinitely;
    • separate "Later release" and "Not in MVP" badges (new input DH-U34);
    • an OS-A legend;
    • three PROPOSAL markings.
  • PRISMA amendment ranges.
  • RI §3.5 for search withdrawal.

9.7 Limits of this round

  • The specifications, rollout plan and tracker are planning documents; nothing in them has been built, measured or piloted. Every numeric threshold remains a proposal.
  • Live states are snapshots from 5 October 2026 and must be rechecked before any decision.
  • The design handoff was written for the Claude Design session; it has not been sent or tried.

10. Harvest map (5 October 2026)

Chris asked how the existing question-management implementation fits the plan. The answer recorded in #4045's documents was Q-08 and Q-09 (harvest, don't revive), but #4045's new deliverables never mentioned the harvest. This round adds the harvest map. Times are BST. Feature implementation remains on hold; this round changed planning documents and the status page only.

10.1 Inputs

  • The heads of 13 open PRs, fetched read-only as refs/remotes/audit/pr<N>: #2461, #2572, #2573, #2574, #2575, #2224, #3934, #2781, #2387, #2986, #2987, #2629 and #2812. Their heads, states and sizes are in the harvest map §3.
  • The package on main at adf27893d (after #4045).

10.2 Sub-agents

Agent Purpose Type / model
Audits A to E (5) Read-only audits of the PR groups against the specifications, saved verbatim in reviews/harvest-2026-10-05/ general-purpose / Opus
Writer The harvest map, tracker rows, specification §15 sections (RD, BC, UX, ACD, SP), guide §19 and rollout §7.7 sdd-worker / Opus
Verifier V5 Fresh-context, read-only check of evidence, counts, tracker, boundaries, consistency and links general-purpose / Opus

The first launch of the five audits was stopped before any output at a usage limit, and the audits were re-run from the same brief.

10.3 Writes made

  • Commits on PR #4061 only, in the worktree pr/pr4061.planning-qm-v2-and-dormant-pr-harvest-map-e2ujxx created with wt new.
  • The status page was rebuilt with the 116-row tracker and republished in place, keeping its recorded answers.
  • No PR was ported, rebased, commented on or closed. No review state changed.

10.4 Validation

Check Result
./docs/scripts/validate-docs.sh --skip-indexes --skip-links Exit 0; 64 warnings, none from this package
Relative links and anchors across 65 package files (GitHub and MkDocs slug rules) 2,559 checked, 0 broken
generate-mkdocs-nav.py Navigation regenerated (harvest map added)
Harvest entries against the audits 131 entries, one to one, same verdicts and effort grades (V5 recomputed: 6 Reuse, 41 Adapt, 35 Reference only, 49 Avoid; 5 outside the programme)
Evidence citations V5 opened about 40 cited path:line @ SHA locations; all supported, except one count (20 test facts, not 22), now corrected in the map and noted on audit E
Tracker 116 rows (10 brief rows, 106 others; 95 implementation rows); every cited row ID exists
Fresh-context verifier V5 No Blocker, 1 Major (the guide described PR-C's deletion as having happened; it never ran), 12 Minor; all fixed

10.5 Limits

  • The audits read code; nothing was built or run, so test-pass claims in the PRs are unverified.
  • E-D1's "two production documents" with stray groups was not re-checked against production.
  • Effort figures are estimates for planning, not commitments.

11. Owner answers (5 October 2026, evening)

Chris asked for two sets of owner answers to be recorded. Feature implementation remains on hold; this round changed planning documents only. It closes no PR, approves no brief, authorises no implementation (including #2986's wiring fix) and lifts nothing. §9 and §10 above stay as their dated records.

11.1 Inputs

  • D2-09. Chris's answer on the programme status page on 5 October 2026 at 03:37 BST (02:37 UTC), recorded as answers/D2-09: choice "agree", with the note "But should be encourage to provide a reason (though not compulsory). They can also raise query if need be." He asked in the planning session the same day for it to be recorded.
  • Harvest map §10. Chris in the planning session on 5 October 2026 (evening): "agree with decisions 1-3".

11.2 Writes made

  • Docs only, in the worktree pr/pr4071.planning-record-d2-09-and-harvest-decisions-74wq9t. Decision register §1.16 records both sets of answers; the owner ledger, open questions, G0 dossier, harvest map, implementation tracker, owner-session integration, product-owner guide, rollout plan, README, integrated plan, delivery operating model, domain, versioning and consistency models, contracts, acceptance criteria, methodology coverage, source-status inventory, the specifications overview, RD, RS and the design-prototype handoff are updated to match.
  • The design-prototype handoff gains a "Questions shared with another form" block in §5.5, change DH-C99 and scenario DH-S51; DH-U27 is marked "Decided (D2-09, 5 October)". Nothing was sent to the design session.
  • No PR was closed, commented on or changed, and the status page was not changed.

11.3 Validation

Check Result
Count reconciliation recomputed from the open-questions statuses 64 + 25 + 0 = 89: 34 Decided, 25 Decided-amended, 3 Replaced, 1 Removed, 1 Deferred; 17 Brief items, 5 Specialist inputs, 3 Engineering contracts; no open owner decision
Design handoff totals 99 changes (51 Modify, 41 Add, 6 Remove, 1 Modify and Add); 51 scenarios; 34 inputs, 33 open and DH-U27 decided
./docs/scripts/validate-docs.sh --skip-indexes --skip-links Exit 0; 64 warnings, none from this package (all 65 package lines are passes)
Relative links and anchors across the package and the owner ledger (GitHub and MkDocs slug rules) 2,598 checked, 0 broken; the new anchor #116-owner-answers-5-october-2026-evening resolves under both rules
Search for D2-09 and for "one decision open", "only open", "1 open", "answer D2-09", "parameterised", "both options" and "until Chris answers" Every remaining D2-09 mention is neutral, uses the decided status, or is a dated record with an update beside it

12. Question-management integration and design open questions (5 October 2026, evening)

Chris asked for the new question management (QM) to be integrated properly: reuse and adapt the salvageable work already carried out, fit it to the plans and specifications written in the past week, and include it in the design prompt. He then asked for a document of every open question to settle in a Codex session before the updated pack goes to Claude Design. This round, PR #4076, adds the question-management plan and open questions before the Claude Design handoff. Feature implementation remains on hold, and nothing was sent to the design session.

12.1 Inputs

  • origin/main at af2d8e960 for the read-only research, and 9ed9752c4 (after #4071) for the merge into the branch.
  • The question-management code and docs already on main (M-01 to M-35), and the past week's plans outside this package: the architecture-review plans of #3961 (realtime server and client, state management, surface area, frontend and backend bug fixes, persistence and messaging with ADR-021, System.Text.Json, build and CI), the statistics decision brief, the AF2, Material 3, Study Management and flag documents, the application authority transition, and the 2–3 October review documents.

12.2 Sub-agents

Agent Purpose Type / model
Research (3) Read-only: the QM inventory of main; the alignment with this week's plans (49 interactions); the design-handoff gap analysis general-purpose / Opus
Writer 1 The question-management plan, tracker, harvest map, rollout plan, acceptance criteria and planning cross-references sdd-worker / Opus
Writer 2 The RD, UX, ACD and BC specification bodies, contracts, consistency and domain models, the guide §20 and the design handoff sdd-worker / Opus
Writer 3 The open-questions document (DQ-01 to DQ-45, classes A, B and C) sdd-worker / Opus
Verifier V6 Fresh-context, read-only check of code claims, plan claims, owner decisions, counts, the handoff, the open questions, boundaries and links general-purpose / Opus
Fixer V6's findings sdd-worker / Opus

12.3 Writes made

  • Commits on PR #4076 only, in the worktree pr/pr4076.planning-integrate-question-management-across-plan-01kfzl created with wt new (stacked on #4071, then retargeted to main when #4071 merged, and main merged in).
  • mkdocs.yml gained the two new documents' nav entries. No file outside docs/planning/ and mkdocs.yml changed. The architecture-review plans were not edited; the changes they need are listed in the plan's "Changes proposed to other plans".
  • No PR was ported, closed or commented on beyond review requests. No flag changed.

12.4 Validation

Check Result
./docs/scripts/validate-docs.sh --skip-indexes --skip-links Exit 0; 64 warnings, none from this package
Relative links and anchors across 67 package files (GitHub and MkDocs slug rules) 2,838 checked before V6's fixes and 2,850 after them; 0 broken both times
Tracker 119 rows (21 fixed; 97 implementation; T-RD-17, T-UX-10 and T-OI-02 added); §4 recomputes
Acceptance criteria 14 new rows, 1 r row, 17 amended, 1 retired (AC-R1a-06); §9.8 places 317 evidence items, none unplaced
Design handoff totals 118 DH-C, 67 DH-S, 41 DH-U (40 open), 19 DH-T; §13 prompt covers question management
Open questions 4 class A, 41 class B, 36 class C rows; every open DH-U and DH-T item, the 17 confirm items, QMI-01 to QMI-05, the rollout ambiguities and the specialist inputs appear exactly once
Fresh-context verifier V6 No Blocker, no Major, 16 Minor. 17 code claims checked (16 held; one file count off by one); 20 cross-plan claims held; 822 cited IDs resolve; 264 links on added lines resolve. All findings fixed (F13 is this section)

12.5 Limits

  • The research read code and plans; nothing was built or run.
  • The changes the architecture-review plans need are proposals in the plan, not edits to those plans; that session or Chris applies them.
  • The open-questions document prepares a discussion. Its recommendations are not decisions.

13. Specification gaps closed before the design handoff (6 October 2026)

In the discussion of 5–6 October 2026, Chris answered several questions and raised gaps to close before the design pack goes to Claude Design. This round, PR #4096, records his answers in decision register §1.17 and the owner ledger. It also adds the classification, populations and references specification, updates the specifications, tracker, acceptance criteria, design handoff and open questions. Feature implementation remains on hold, and nothing was sent to the design session.

13.1 Inputs

  • Chris's words in the planning session (quoted verbatim in the register): training does not gate GA; DQ-31 as recommended; configurable answer metadata; required by default with designer-configurable no-value answers.
  • docs/planning/unified-annotation-classification-research.md (Chris and Codex, 24 September to 3 October 2026), contract C13 and the plan's C1 lane, for the new specification.
  • Code facts were read-only at 286c73b37 and 172dc9b79: AnnotationQuestion.Optional and AnnotationLookup, the five fixed lookups, and the relationship validator's lookup map.

13.2 Sub-agents

Agent Purpose Type / model
Writer A The CPR specification (CPR-R01 to R41, CPR-AE01 to AE31) and the RI export overlap markers (RI-R59 to R63) sdd-worker / Opus
Writer B Answers, requiredness, metadata, payload, conversion and training: RD-R49 to R54, BC-R49, TI-R37, the versioning model and contracts sdd-worker / Opus
Writer C Integration: register, ledger, tracker (workstream CP), acceptance criteria, design handoff, open questions (DQ-46 to DQ-50), guide §21 and plans sdd-worker / Opus
Verifier V7 Fresh-context, read-only check of fidelity, the CPR specification, consistency, counts, the handoff, the open questions, boundaries and links general-purpose / Opus
Fixer V7's findings sdd-worker / Opus

13.3 Writes made

  • Commits on PR #4096 only, in the worktree pr/pr4096.planning-close-spec-gaps-before-design-handoff-4eu6vk created with wt new.
  • A dated integration note was added to the classification research (§7) pointing to the CPR specification. No other file outside the package changed apart from the owner ledger.
  • No PR was ported or closed, and no flag changed.

13.4 Validation

Check Result
./docs/scripts/validate-docs.sh --skip-indexes --skip-links Exit 0; 64 warnings, none from this package
Relative links and anchors across 68 package files plus the research note (GitHub and MkDocs slug rules) 3,005 relative links and anchors across 68 package files, plus 16 in the research document, after V7's fixes and the merge of main; 0 broken
Tracker 129 rows (11 brief rows, 118 others); §4 recomputes; new workstream CP (T-CP-00 to T-CP-09)
Acceptance criteria 43 new rows and 20 amended; §9.8 places 362 evidence items, including CPR's 31
Design handoff 129 DH-C, 77 DH-S, 44 DH-U (3 decided), 23 DH-T; §13 prompt covers the new screens and says naming is open
Open questions Class A 5 (DQ-46 naming added), class B 43 (41 open), class C 40 rows (39 open); DQ-05, DQ-31 and R-AMB-01 decided with sources
Fresh-context verifier V7 No Blocker, 2 Major (the beta's scope was misstated as agreed; "None reported" sat inside OWNER text), 12 Minor; all fixed. Owner quotes matched word for word; about 70 cited IDs and 210 links on added lines resolved

13.5 Limits

  • The naming, recording unanswered, DQ-32, training guidance, reference-question timing and the beta's scope stay open for Chris's Codex session, with recommendations only.
  • The CPR specification is planning; its rules are PROPOSAL unless an owner decision covers them.

14. Design-handoff answers integrated (6 October 2026)

Chris settled the design questions in a Codex discussion on 6 October 2026 and asked for today's answers to be incorporated and checked. This round, PR #4102, records them in decision register §1.18 and the owner ledger, and rolls them into the design pack following §6 of the open questions. Feature implementation remains on hold. The pack was not sent, and no agent messaged the design session; sending is Chris's step (T-DH-01).

14.1 Inputs and integrity

  • Chris's decision record /home/chris/workspace/syrf/handover/owner-session-2026-10-05/syrf-design-decisions-2026-10-06.md (4,636 bytes, SHA-256 5c57deecc80ea648fc8aa0729635ce582ed7646e8d296d8ea2078b66b9a842da), archived byte for byte as owner-session-2026-10-05/syrf-design-decisions-2026-10-06.md.txt. sha256sum -c over the archive README's list verifies all 14 files.
  • The answers: DQ-01 (a), DQ-02 ©, DQ-03 (a), DQ-04 (b), DQ-46 with amended terminology, and DQ-09 (a). No other question was treated as answered.
  • Current main at ac0d71336 was the base, so no newer work was overwritten.

14.2 Sub-agents

Agent Purpose Type / model
Writer 1 Design handoff (§5, §6.2, §11, §12, the §13 prompt, glossary and banned strings), open questions, product-owner guide, UX specification and UX strategy sdd-worker / Opus
Writer 2 Decision register §1.18, owner ledger, open questions and assumptions, tracker, acceptance criteria, question-management plan, owner-session integration, rollout and integrated plans, G0 dossier, README, harvest map sdd-worker / Opus
Writer 3 The RD, CPR, TI, RS, BC and RI specifications, versioning model, contracts, domain and consistency models (DQ-46 terminology and payload; DQ-09 option (a); DQ-01 and DQ-03 in RD) sdd-worker / Opus
Fixer Placement of RD-AE46, TI-AE27 and RI-AE46; harvest-map terminology sdd-worker / Opus
Verifier V8 Fresh-context, read-only check of fidelity, terminology, counts, the pack, boundaries and links general-purpose / Opus

14.3 Writes made

  • Commits on PR #4102 only, in the worktree pr/pr4102.planning-integrate-design-handoff-answers-ttkpag created with wt new.
  • The archive gained one file and one README row. Outside the package only the owner ledger changed.
  • The status page is updated after merge, keeping its recorded answers.

14.4 Validation

Check Result
./docs/scripts/validate-docs.sh --skip-indexes --skip-links Exit 0; 64 warnings, none from this package
Relative links and anchors across the package (GitHub and MkDocs slug rules) 3,146 checked across 68 files after V8's fixes and the merge of main; 0 broken
Archive checksums 14 of 14 match
Open questions Class A 5 items, 0 open; class B 43 items, 40 open (DQ-05, DQ-09, DQ-31 decided); class C 40 rows, 39 open
Design handoff 129 DH-C, 77 DH-S, 44 DH-U (9 decided, 35 open), 23 DH-T; the §13 prompt has the decided answer terms and no "NAMING IS OPEN" line
Tracker 129 rows (unchanged); T-OI-02 records QMI-04 answered in part; T-DH-01's remaining blocker is this PR merging, then Chris's choice to send
Acceptance criteria 21 rows amended; evidence placement: §9.8 places 365 items (RD 46, TI 27, RI 46 after RD-AE46, TI-AE27 and RI-AE46), none unplaced
Fresh-context verifier V8 No Blocker, no Major, 7 Minor (unlabelled residual "response mode" wording in C4 and the domain model; carried labels called decided; DQ-09 paraphrase quoted as Chris's words; unlabelled inferred readings; an untagged PROPOSAL name). All fixed. 471 cited IDs and 129 added links resolved; every count recomputed

14.5 Limits

  • "No value to enter" stays illustrative wording; "Not compared (unanswered)", "Unanswered" and "Option" are carried from the recommendation, not separately discussed.
  • QMI-04 is answered in part: the retirement timing of the legacy designer stays a recommendation.
  • The other 40 class B and 39 class C questions stay open as labelled options.